在大体积碾压混凝土施工中,经常会遇到工期紧、任务重的情况,致使不得不选择在雨季进行碾压混凝土浇筑施工。以曼点为例介绍雨季进行碾压混凝土浇筑施工的仓面处理方法,既能在雨季赶上施工进度又能使混凝土质量得到保证。
In the construction of large volume roller compacted concrete,it is often encountered that the construction period is tight and the task is heavy,so it is necessary to choose the construction of roller compacted concrete in rainy season.Taking man point as an example,this paper introduces the treatment method of warehouse surface for RCC pouring construction in rainy season,which can not only catch up with the construction progress in rainy season,but also ensure the quality of concrete.