PTC桩复合地基动态施工监测

Dynamic Construction Monitoring of PTC Pile Composite Foundation
下载PDF
导出
摘要 针对高速公路PTC桩复合地基工程量特别大,工期控制紧迫,施工质量要求高、可借鉴经验少的特点,为严格控制PTC桩的施工质量,保证软基处理效果,通过地质差异、施工工艺和影响因素等方面研究,设计一套动态施工监测方案。实践表明,静压桩复合地基动态施工监测设计合理、方案可行、实施高效,可为同类工程提供经验借鉴。 For the PTC pile composite foundation of highway is characterized by large amount of work,urgent construction period,high construction quality requirement and less experience,in order to strictly control the construction quality of PTC piles,ensure the soft foundation treatment effect,a dynamic construction monitoring program was designed through a study of geological differences,construction techniques and influencing factors.The practice shows that the dynamic construction monitoring program of static pressure pile composite foundation is reasonable in design,feasible in program and efficient in implementation,which can provide experience for similar projects.
作者 雷明波 李军心 黄小雁 LEI Mingbo;LI Junxin;HUANG Xiaoyan(Wuhan Integrated Transportation and Urban Construction Design Institute,CCCC First Highway Consultants Co.,Ltd.,Wuhan,Hubei 430068,China;School of Human Settlements and Civil Engineering,Xi’an Jiaotong University,Xi’an,Shaanxi 710049,China;School of Architecture and Civil Engineering,Xiamen Institute of Technology,Xiamen,Fujian 361021,China)
出处 《施工技术》 CAS 2020年第S01期217-219,共3页 Construction Technology
基金 福建省教育科研项目(JA15605)
关键词 高速公路 PTC桩 复合地基 施工监测 highway PTC pile composite foundation construction monitoring
  • 相关文献

参考文献9

二级参考文献46

共引文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部