摘要
浅埋暗挖中临时支撑施工,需在开挖过程中拼装。开挖完成后,施做主体前进行拆除,频繁的拼装、拆除导致工序繁琐,费时费力。四平管廊项目在实际施工中,探索出在管廊中隔墙处加入永久支撑,以代替临时支撑,永久支撑在后期不再拆除,直接浇筑于混凝土中。本文从临时支撑变更永久支撑的效益及加快进度等方面入手,探讨操作实现的可能性。
Temporary support construction in shallow and underground excavation needs to be assembled during excavation.After the excavation is completed,the main body is demolished before the implementation.Frequent assembly and demolition lead to tedious and time-consuming processes.In the actual construction of Siping Pipe Gallery project,it is explored that permanent support should be added to the partition wall of the pipe gallery to replace temporary support.Permanent support will not be dismantled in the later stage,but will be directly poured into concrete.Starting from the benefits of temporary support changing permanent support and speeding up the progress,this paper discusses the possibility of operation realization.
作者
刘俊奇
张世杰
LIU Junqi;ZHANG Shijie(The First Construction Co.,Ltd.of CCCC Fourth Highway Engineering Co.,Ltd.,Beijing 100123,China)
出处
《施工技术》
CAS
2019年第S01期719-722,共4页
Construction Technology
关键词
管廊
浅埋暗挖
支撑
可操作性
utility tunnel
shallow buried covered excavation
supports
maneuverability