摘要
土耳其某火力发电厂位于土耳其2023年2月6日7.8级大地震震中附近。以震中测点实际观测到的4条不同特点的地震加速度时程为输入,对已建火力发电厂主厂房进行了震后复算,对原有设计方法和设计经验进行了总结。
A thermal power station in Turkey is located near the epicenter of the 7.8 magnitude earthquake on February 6,2023.In this paper,the post earthquake recalculation of the main building of the existing thermal power plant is carried out based on 4 different kinds of earthquake acceleration waves actually observed,and the original design method and design experience are summarized.
作者
苗毅
MIAO Yi(East China Electric Power Design Institute Co.,Ltd.,China Power Engineering Consulting Group,Shanghai 200333,China)
出处
《武汉大学学报(工学版)》
CAS
CSCD
北大核心
2023年第S01期76-81,共6页
Engineering Journal of Wuhan University
关键词
火力发电厂主厂房
抗震设计
震后分析
非线性时程分析
main building of thermal power plant
seismic design
post earthquake analysis
nonlinear time history analysis