以国内某燃机电厂项目的电控楼为例,研究基于建筑信息模型(building information modeling,BIM)技术的发电厂装配式建筑的结构一体化设计方法,总结项目设计阶段的工作流程,包括预制构件的范围确定、结构构件拆分、结构分析、深化设计出图、模型轻量化应用,为国内企业在电力工程中运用BIM实施装配式建筑设计提供参考。
Taking the electrical control building project of a domestic gas turbine power plant as an example,this paper studies the integrated design method of power plant prefabricated building based on BIM technology,and summarizes the work process of the project design stage,including the scope determination of prefabricated components,structural component splitting,structural analysis,design deepening and lightweight applications of models,etc.This study provides reference for domestic enterprises to use BIM to implement prefabricated building design in power engineering.
作者
周承宗
黄慧
ZHOU Chengzong;HUANG Hui(Jiangsu Power Design Institute Co.,Ltd.,China Energy Engineering Group,Nanjing 211102,China)
出处
《武汉大学学报(工学版)》
CAS
CSCD
北大核心
2022年第S02期119-124,共6页
Engineering Journal of Wuhan University
关键词
发电厂
装配式建筑
BIM
一体化
power plant
prefabricated building
BIM
integrated design