摘要
为了更好地实现电厂主厂房去工业化的效果,取消超长钢结构主厂房伸缩缝。本文从现有超长钢结构厂房案例分析入手,结合计算分析和合理的结构布置。实现了大型燃煤电厂两台机厂房超长结构的目标,在某百万级燃煤电厂项目中实施,取得了良好的效果。本文所提出的结构布置方案和计算方法是可行的。
In order to better realize the effect of deindustrialization of the main power house of the power plant and cancel the expansion joint of the main power house of super long steel structure,starting with the case analysis of the existing super long steel structure power house,combined with the calculation analysis and reasonable structure layout,the goal of super long structure of two power houses of large coal-fired power plant has been achieved,which has been implemented in a million level coal-fired power plant project,and achieved good results.The structural arrangement scheme and calculation method proposed in this paper are feasible.
作者
陶林惠
何琼芳
尹谦钧
TAO Linhui;HE Qiongfang;YIN Qianjun(Guangdong Electric Power Design Institute Co.,Ltd.,China Energy Engineering Group,Guangzhou 510663,China;Guangdong Communication Polytechnic,Guangzhou 510630,China)
出处
《武汉大学学报(工学版)》
CAS
CSCD
北大核心
2021年第S02期103-109,共7页
Engineering Journal of Wuhan University
关键词
去工业化
超长钢结构
伸缩缝
de-industrialization
super long steel structure
expansion joint