摘要 塞尔维亚是我国"一带一路"倡议在东欧区域的重要节点,而基础设施建设在"一带一路"沿线国家间的合作中更占据着重要的地位。由于我国与塞尔维亚文化语言的差异以及设计理念的不同,在土建结构设计中,从概念设计阶段到施工图设计阶段都在图纸审查中遇到困难。因此,深入理解当地设计理念及作图习惯,可以让设计过程少走弯路,对于提升设计效率、缩短设计周期起着关键作用。基于塞尔维亚某燃煤电厂,对该项目混凝土结构在施工图审查过程中的意见进行归纳整理,总结了当地对混凝土结构设计内容及深度的要求,并简要介绍了如何通过钢筋绘制软件ARMCAD的使用,更高效地达到当地图纸深度要求。 Serbia is one of the most important partners under the initiative of"One Belt and One Road",in which infrastructural construction plays a major role.However,due to the differences in culture and design concept between Serbia and China,there are problems in basic design stage and detailed design stage.Understanding Serbian design concept better can prevent useless effort and improve efficiency.Based on a coal-fired power plant in Serbia,this paper first introduces the key points that need to be noticed in different design stages.Then the design methods for concrete structure drawing is summarized by analyzing the opinions from the local examination department.Finally the application of a software-ARMCAD used in concrete structure design is expleored.
作者 马力夫 陈伊军 王进 丁伟亮 MA Lifu;CHEN Yijun;WANG Jin;DING Weiliang(Central Sourthrn China Electric Power Design Institute Co.,Ltd.,China Power Engineering Consulting Group,Wuhan 430072,China)
出处 《武汉大学学报(工学版)》 CAS CSCD 北大核心 2020年第S01期330-334,共5页 Engineering Journal of Wuhan University
关键词 塞尔维亚 设计审查 施工图设计 混凝土结构 serbia design examination construction drawing concrete structure

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部