期刊文献+

某厂房桩基工程事故调查及分析 被引量:4

An investigation and analysis of the pile construction accident of a power house
原文传递
导出
摘要 以广东某电力厂房的基桩工程事故为调查研究对象,对基桩施工后发生不均匀沉降的事故原因进行了调查,采用多种岩土工程手段对所有可能的事故原因进行定性分析,确定了该项目的前期岩土工程勘察未对该场地地质情况进行正确揭露,同时基桩施工过程未严格按照施工工艺的要求对施工质量进行把控,是本次事故的主要原因。 According toa comprehensive and thorough investigation,several reasons for the uneven settlements of the power house foundation were revealed.Through the special geotechnical engineering investigation and the check calculation of the construction documents,this paper discovered the mistake of the original geotechnical engineering investigation,and the violation of the technical specification for pipe pileduring thepile-constructing.This paper points out that some factors and causes of theserious engineering accidents occurring in foundation.
作者 杨新辉 姚强 周圣斌 佟建兴 孙训海 YANG Xinhui;YAO Qiang;ZHOU Shengbin;TONG Jianxing;SUN Xunhai(China Academy of Building Research,Beijing 100013,China;Zhejiang Zhonghe Engineering Testing Co.,Ltd.,Hangzhou 310021,China)
出处 《武汉大学学报(工学版)》 CAS CSCD 北大核心 2020年第S01期293-298,共6页 Engineering Journal of Wuhan University
关键词 工程事故 基桩 不均匀沉降 岩溶地区 engineering accident pipe pile construction uneven settlement karst area
  • 相关文献

同被引文献36

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部