基于熵值法与可拓学理论的PPP项目风险评价 被引量:1

Risk assessment of PPP projects based on entropy method and extenics
下载PDF
导出
摘要 针对PPP项目实施过程中存在的问题,采用熵值法结合可拓学理论对PPP项目的风险进行评价。分析了PPP项目风险评价指标体系,由专家对某PPP项目的各指标进行打分,采用熵值法根据指标数据计算二级指标的权重,由可拓学方法对该PPP项目的风险进行评价,评价结果显示:该项目的风险级别为低风险,可为PPP项目实施提供决策参考,确保项目达到预期目标。 In view of the problems in the implementation of PPP projects, the entropy method and extenics theory were used to evaluate the risks of PPP projects. The risk evaluation index system of PPP project is analyzed. The experts grade each index of a PPP project. The entropy method is used to calculate the weight of the secondary index according to the index data. The extenics method is used to evaluate the risk of the PPP project. The evaluation results show that the risk level of the project is low risk. The results can provide decision-making reference for PPP project implementation and ensure that the project achieves the expected objectives.
作者 王彦彬 贾崇 张竞一 WANG Yanbin;JIA Chong;ZHANG Jingyi(College of Business Administration,Liaoning Technical University,Huludao 125105,China;Huludao Real Estate Survey Co.,Ltd.,Huludao 125000,China)
出处 《辽宁工程技术大学学报(社会科学版)》 2019年第6期415-420,共6页 Journal of Liaoning Technical University(Social Science Edition)
基金 辽宁省社科规划基金(L18BGL020) 辽宁省教育厅辽宁省高等学校基本科研项目(Lj2017QW009).
关键词 PPP项目 风险评价 熵值法 可拓学 PPP project risk assessment entropy method extenics