摘要
陕西彬长矿区亭南煤矿207工作面为二盘区第五个回采工作面,采用综采放顶煤回采工艺。回采前工作面采用采前预疏放、回采过程中采用向相邻采空区打煤泥水,低位泄水和面后排清水以及仰采范围内采用阶梯式放水等综合措施,彻底解决工作面回采期间的水害问题。通过对亭南煤矿207工作面综合防治水技术应用研究,积累了复杂条件下工作面防治水技术经验。
Working face 207 in Tingnan coal mine 2 is the fifth working face in the second panel,adopts fully mechanized caving technology.Comprehensive measures such as pre-dredging before mining,pumping slime water to adjacent goaf in the process of stoping,low drainage and clear water at the back of the face,and ladder-type water discharging in the range of upward mining are adopted on the working face to completely solve the prevention and control of water damage during stoping.
作者
谷占兴
GU Zhanxing(Shaanxi Changwu Tingnan Coal Co.Ltd.,Xianyang 713602,China)
出处
《煤田地质与勘探》
CAS
CSCD
北大核心
2019年第S01期75-80,共6页
Coal Geology & Exploration
关键词
采空区注水
低位泄水
面后排清水
阶梯式放水
water injection in goaf
low-level drain
clear water drainage behind working face
step discharge