摘要
介绍了星港国际中心施工模拟分析情况,考虑徐变收缩和施工过程的混凝土构件竖向变形分析,利用MIDAS-Gen程序对结构进行了弹性施工模拟,并对不同施工模拟工况进行对比,得出符合实际情况的结论,对同类工程具有指导意义。
The construction simulation analysis of Xinggang International Center was described.Creep and shrinkage and construction process of vertical deformation of the concrete structures were considered.Construction simulation was analyzed using MIDAS-Gen program.The conclusions can provide reference for similar projects.
作者
刘桂然
Liu Gui-ran(Institute of Shanghai Architectural Design&Research,Shanghai 200041)
出处
《建筑科学》
CSCD
北大核心
2020年第S02期68-71,共4页
Building Science
关键词
施工模拟
收缩
徐变
竖向变形差
超高层
construction simulation
shrinkage
creep
deformation difference
super high-rise building