期刊文献+

卵石地层中钻孔灌注桩成桩质量问题分析 被引量:2

Analysis on Quality Problems of Bored Piles in Pebble Stratum
下载PDF
导出
摘要 在济南西郊山前冲洪积层地区,18层以上的高层建筑均采用桩筏基础,其中桩基础采用钻孔灌注桩,持力层选择在卵石层或砂层上。粗粒土层因其承载力高通常被认为是良好的桩端持力层,但由于其缺乏粘聚力,施工过程控制不严也会带来桩基质量方面的问题。通过对工程实例的分析,探讨卵石地层中钻孔灌注桩质量问题的原因,提出相应的防治措施,为类似工程提供借鉴。 In the Piedmont Alluvial-diluvial zone in the western suburb of Jinan,piled raft foundation is used for high-rise buildings above 18 stories,in which bored piles are used for pile foundation,and the bearing layer is chosen on pebble or sand layer.Coarse-grained soil is usually considered as a good pile-end bearing stratum because of its high bearing capacity.However,due to its lack of cohesion,quality problems of pile foundation is also occurred without strict control of construction process.Through a case history of a bored cast-in-place pile foundation,the causes of quality problems of bored piles in pebble stratum are discussed,and corresponding prevention measures are put forward,which can provide reference for similar projects.
作者 肖俊华 崔冠科 Xiao Jun-hua;Cui Guan-ke
出处 《建筑技术开发》 2020年第10期106-108,共3页 Building Technology Development
关键词 灌注桩 持力层 卵石层 防治措施 bored cast-in-place pile bearing stratums pebble layer prevention measures
  • 相关文献

参考文献5

二级参考文献24

共引文献12

同被引文献12

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部