期刊文献+

铁路桥地下污水处理厂设计方案分析

Design analyses of railway bridge underground sewage treatment plant
下载PDF
导出
摘要 从工程设计特点、整体性设计、安全性设计三个方面论述铁路桥地下污水处理厂设计方案,重点探讨地下污水处理厂总平面布置、结构设计选型、工艺选型、防水淹、消防设计、有毒有害气体后处理等内容。工程实施过程中表明,设计方案合理,达到预期目标。 From the characteristics of engineering design,overall design,safety design is discussed the railway bridge underground sewage treatment plant design in three aspects,the paper mainly discusses the underground sewage treatment plant general layout,structure design,type selection,technology selection,prevent flooding,fire fighting design,post-treatment of poisonous and harmful gas,etc.Shows that in the process of project implementation,reasonable design,achieve anticipated goal,can provide a reference for similar project design and construction.
作者 卢仲兴 夏云峰 焦鹤 LU Zhongxing;XIA Yunfeng;JIAO He(China Construction Third Bureau Green Industry Investment Co.,Ltd.,Wuhan 430056,China)
出处 《给水排水》 CSCD 北大核心 2022年第S02期132-136,共5页 Water & Wastewater Engineering
关键词 地下污水处理厂 结构设计 工艺选型 地下工程安全设计分析 Underground sewage treatment plant Structure design Process selection Safety design analysis of underground engineering
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部