摘要
基于垃圾综合处理基地内填埋场、焚烧厂等垃圾处理设施的建设、运营进展情况,通过对污水水质进行预测,对原初步设计文件进行优化,使项目出水达到《生活垃圾填埋场污染控制标准》(GB 16889-2008)和广东省《水污染物排放限值》(DB 44/26-2001)一级标准。
Based on the construction and operation of garbage treatment facilities such as iandfill and incineration plant in the comprehensive garbage treatment base,by predicting wastewater quality and optimizing the original preliminary design documents,the effluent reaches the standards of the Standard for pollution control on the landfill site of municipal solid waste(GB 16889-2008)and the first-level standards of the Discharge limits of water pollutants(DB 44/26-2001)in Guangdong province.
作者
苏振兴
蔡思鑫
谢娟毅
于超
季晓玥
苏婉
刘月明
张小玲
SU Zhenxing;CAI Sixin;XIE Juanyi;YU Chao;JI Xiaoyue;SU Wan;LIU Yueming;ZHANG Xiaoling(Tianjin Branch of Wuxi Municipal Design and Research Institute Co.,Ltd.,Tianjin 300161;Zhejiang Industry and Trade Vocational College,Wenzhou 325003;Tianfang Technology Group Co.,Ltd.,Tianjin 300090;China Urban Construction Design and Research Institute Co.,Ltd.,Beijing 100120)
出处
《给水排水》
CSCD
北大核心
2022年第S01期574-576,共3页
Water & Wastewater Engineering
关键词
垃圾综合处理
渗沥液
浓缩液
臭氧氧化
Comprehensive garbage treatment
Leachate
Concentrated liquid
Ozone oxidation