摘要 以青岛某机场配套区综合管廊建设为例,阐述了综合管廊建设前期需要优化控制的相关内容,关注管廊的系统性和经济性建设需要,在管廊路由选取、上位规划分析、管廊断面确定、管线系统优化、入廊管线选取等方面进行了相关分析并提出了解决方案和思路。 Taking an utility tunnel project in Qingdao airport as an example,explains the aspects that need to be considered in the early stage of the construction of utility tunnel.Focused on the systematic and economic nature of utility tunnel construction,analyzes the selection of route and pipe into the utility tunnel,the method for determining cross-sections and optimizing pipeline systems and how to analyze planning.
作者 卢钢 马升平 房宝智 LU Gang;MA Shengping;FANG Baozhi(Qingdao Municipal Engineering Design&Research Institute,Qingdao 266000,China;Qingdao International Airport Group,Qingdao 266300,China)
出处 《给水排水》 CSCD 北大核心 2022年第S01期988-991,共4页 Water & Wastewater Engineering
关键词 综合管廊 前期工作 系统优化 入廊管线 Utility tunnel Prophase work System optimization Pipeline in utility tunnel
  • 相关文献

参考文献5

二级参考文献28

共引文献178

同被引文献11

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部