非洲刚果河某高扬程大型取水输水工程中的水锤防护措施

Water hammer protection measures in a large water intake and delivery project with high lift in Congo River, Africa
下载PDF
导出
摘要 非洲刚果河某取水工程因流量大、扬程高,其供电系统不稳定,在断电事故工况时极易发生严重的断流弥合水锤。借助水锤模拟软件,研究了因断电导致停泵时不同水锤防护措施对输水管网的影响,结果表明,采用多功能水泵控制阀+三孔空气阀+内胆式水锤消除罐的组合水锤防护措施能够有效降低正压,消除负压,保证管道安全。 Due to the large flow and high lift,the power supply system of a water intake project in Congo River is unstable,which is prone to serious water hammer when the power is cut off.With the water hammer simulation software,the influence of different water hammer protection measures on the water distribution network when the pump stops due to power failure is studied.The results show that the combined water hammer protection measures of multi-functional pump control valve+three hole air valve+inner tank water hammer elimination tank can effectively reduce the positive pressure,eliminate the negative pressure and ensure the safety of the pipeline.
作者 姜春杰 JIANG Chunjie(Nanjing Municipal Design and Research Institute Co.,Ltd.,Nanjing 210008,China)
出处 《给水排水》 CSCD 北大核心 2021年第S02期418-421,共4页 Water & Wastewater Engineering
关键词 断流弥合水锤 水锤防护 三孔空气阀 内胆式水锤消除器 Cut off water hammer Water hammer protection Three port air valve Inner tank water hammer eliminator
  • 相关文献

参考文献5

二级参考文献14

共引文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部