期刊文献+

基于BIM5D的建筑工程施工阶段动态管理及优化研究 被引量:24

Research on Dynamic Management and Optimization of Construction Stage of Building Engineering Based on BIM 5D
下载PDF
导出
摘要 基于BIM5D研究建筑工程项目在施工阶段动态化管理过程,应用BIM5D平台对建筑工程施工阶段的投资管理、进度管理、采购管理、安全管理等进行动态管理与优化。以某住宅楼为对象进行实例研究,结果表明:基于BIM5D技术进行建筑工程施工阶段管理,可以显著提高管理效率,直观显示工程进度、资源分配和成本控制情况,促进建筑工程行业高效、准确与精细化管理。 This paper studies the dynamic management process of construction stage based on BIM5D,and uses BIM5D platform to dynamically manage and optimize the investment management,schedule management,procurement management and safety management in the construction stage.Taking a residential building as an example,the results show that the construction stage management based on BIM5D technology can significantly improve the management efficiency,visually display the project progress,resource allocation and cost control,and promote the efficient,accurate and fine management of the construction industry.
作者 田林倩 姜仁贵 朱记伟 张国红 卫星凯 刘新怡 TIAN Linqian;JIANG Rengui;ZHU Jiwei;ZHANG Guohong;WEI Xingkai;LIU Xinyi(College of Civil and Architectural Engineering,Xi’an University of Technology,Xi’an 710048,China;China Railway 12th Bureau Group First Engineering Co.,Ltd,Xi’an 710038,China)
出处 《建筑经济》 北大核心 2022年第S01期487-491,共5页 Construction Economy
基金 国家重点研发计划子课题(2016YFC0401409-1) 陕西省教育厅重点科学研究计划项目(21JT028) 陕西省高校青年杰出人才支持计划项目(2019) 西安理工大学研究生竞赛培育项目(310-252051608)
关键词 BIM5D 动态管理 资源优化 施工阶段 建筑工程 BIM5D dynamic management resource optimization construction stage construction engineering
  • 相关文献

参考文献12

二级参考文献111

共引文献329

同被引文献139

引证文献24

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部