期刊文献+

基于模型分析的核电交付模式选择

Selection Approach for Nuclear Power Project Delivery Method on basis of Model Analysis
下载PDF
导出
摘要 在核电工程项目的前期决策阶段做出最合适的交付模式选择,对核电业主来说至关重要。交付模式选择过程需要考虑多重因素。介绍宏观视角下的开发环境模型和微观视角下的企业能力模型等核电工程交付模式选择方法,以期解决各项因素如何衡量的问题。实践证明是有效的,在国家“一带一路”政策下核电“走出去”实践中应用是有前景的。 It is crucial for the owner of a nuclear power project to select an appropriate project delivery method during early decision-making stages of the project.Multiple factors should be taken into consideration in the selection process.This paper introduces the selection approach on basis of macro-view development context model and micro-view company capability model analysis,which theoretically answers how to measure multiple factors and is proved to be effective in practice,and will be promising for application on nuclear power export under belt and road policy.
作者 张秋海 赵荣君 聂岩 ZHANG Qiuhai;ZHAO Rongjun;NIE Yan(China Nuclear Power Engineering Co.,Ltd,Shenzhen 518124,China)
出处 《建筑经济》 北大核心 2022年第S01期876-878,共3页 Construction Economy
关键词 核电工程 交付模式 多重因素 “一带一路” 核电出口 nuclear power project delivery method multiple factors belt and road policy nuclear power export
  • 相关文献

参考文献2

二级参考文献8

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部