摘要
以社会资本方参与PPP项目为视角,阐释PPP项目实施中的主要风险与防控措施。立足PPP项目建设、运营维护、移交退出阶段分析实操风险要点,并从概算调整、审计结算、工程变更、政府支付、运维管理、价格调整、绩效考核、移交转让等方面提出防范建议,以期为社会资本方参与PPP项目风险识别与防控管理提供参考。
This paper analyzes the practical risks based on the stages of PPP project construction,operation and maintenance,and handover and exit.Then,makes recommendations for prevention in the areas of land acquisition and demolition,audit and settlement,engineering changes,government payment,operation and maintenance management,price adjustment,performance assessment,and handover and transfer,in order to serve as a guide for social capitalists interested in PPP projects risk detection and prevention and control management.
作者
孙红波
SUN Hongbo(China Railway 11 Bureau Group Co.,Ltd,Wuhan 430061,China)
出处
《建筑经济》
北大核心
2022年第S01期314-317,共4页
Construction Economy
关键词
PPP项目
实务风险
建设运营
防控措施
PPP projects
practical risks
construction and operation
prevention and control measures