期刊文献+

A公司标后预算管理优化研究 被引量:1

Research on Optimization of Post Bid Budget Management of A Company
下载PDF
导出
摘要 从A公司对公路工程施工项目标后预算管理的现状出发,运用权变理论和控制理论,结合笔者本人在标后预算管理中的实践经验,在尽量少的改变A公司现有管理制度和管理流程的前提下,有针对性地提出标后预算优化方案。 Starting from the current situation of A company’s post bid budget management of highway engineering construction projects,using contingency theory and control theory,combined with my practical experience in post bid budget management,this paper puts forward a targeted post bid budget optimization scheme on the premise of changing the existing management system and management process of A company as little as possible.Finally,in order to implement the optimization measures smoothly,this paper also puts forward several safeguard measures.
作者 赵世麟 ZHAO Shilin(Beijing Research Institute of Mechanical&Electrical Technology,Beijing 100094,China)
出处 《建筑经济》 北大核心 2021年第S02期60-62,共3页 Construction Economy
关键词 标后预算 管理优化 公路工程施工 post bid budget management optimization highway engineering construction
  • 相关文献

参考文献6

二级参考文献14

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部