摘要
从承包人的角度出发,以FIDIC银皮书(2017版)为主线,列举合同条件中的明示和暗示索赔条款,阐述索赔程序的变动内容,探讨索赔金额和工期的计算方式。然后从索赔权利、索赔程序、索赔内容三个层次分析承包人在合同的索赔管理中的关注重点和应对措施。
From the view of the contractor,taking the conditions of FIDIC silver book(2017 edition)as the main line,this paper lists the obvious and implied claim clauses in the contract conditions,expounds the changes of claim procedure,and discusses the calculation method of claim amount and time.Then,analyzes the contractor’s focus and countermeasures in the contract claim management from the three levels of claim right,claim procedure and claim content.