新冠肺炎疫情影响下合同价款结算分析

Analysis of Contract Price Settlement under Novel Coronavirus Pneumonia
下载PDF
导出
摘要 分析因新冠肺炎疫情导致的工期延误、工地疫情防疫成本增加、人工、材料和设备价格大幅上涨及赶工措施费用增加等问题对合同价款结算产生的风险及其处理建议,并对做好合同价款结算工作进行思考,确保在疫情影响下顺利地完成合同价款结算工作。 This paper analyzes the risks on the settlement of contract price caused by the delay of construction period,the increase of epidemic prevention cost,the sharp rise of labor,materials and equipment prices,and the increase of the cost of rush measures under novel coronavirus pneumonia,puts forward some suggestions,and thinks about the settlement of contract price,so as to ensure that the settlement of contract price can be accomplished.
作者 李梦姣 LI Mengjiao(Investment Evaluation Center,Zhaoqing Finance Bureau,Zhaoqing 526060,China)
出处 《建筑经济》 北大核心 2020年第S01期85-87,共3页 Construction Economy
关键词 新冠肺炎疫情 合同价款 结算 风险分析 COVID-19 epidemic contract price settlement risk analysis