摘要
目前,新冠肺炎疫情尚未完全得到控制,全国各地交通工程建项目面临复工复产。分析疫情条件下交通工程建设项目面临的问题,并结合国家法律法规、相关部门政策,从政府和交通工程建设企业两方面提出针对性建议。
Presently,the epidemic of new crown pneumonia has not been completely controlled.But engineering projects across the country are facing resumption of production.This paper summarizes the problems faced by the traffic engineering construction projects under the epidemic situation.Combining the national laws,regulations,and the relevant policies made by the government,puts forward specific recommendations from the two aspects of government and traffic engineering construction enterprises.
作者
袁霈龙
候义辉
李龙
陶建军
YUAN Peilong;HOU Yihui;LI Long;TAO Jianjun(CCCC-SHEC Dong Meng Engineering Co.,Ltd,Xi’an 710119,China;Shaoxing Traffic Construction Co.,Ltd,Shaoxing 312099,China;School of Highway,Changan University,Xi’an 710064,China)
出处
《建筑经济》
北大核心
2020年第S01期178-181,共4页
Construction Economy
基金
浙江省交通运输厅科技项目“高速公路山岭隧道建设班组管理标准化研究”(2019043)
关键词
新型冠状病毒
交通工程
建设项目
复工复产
novel oronavirus
traffic engineering
construction project
epidemic prevention measures