复杂地质条件下高层建筑钻孔灌注桩施工技术研究 被引量:2

Research on Construction Technology of Bored Pile in High-rise Buildings under Complex Geological Conditions
下载PDF
导出
摘要 为研究复杂地质条件下钻孔灌注桩成桩技术与质量控制措施,文中依托工程实例,以溶洞存在环境下钻孔灌注桩施工技术为研究对象。根据地质补勘资料,通过技术方案优化,针对性地提出了“粘土片石回填”和“钢护筒跟进+粘土片石回填”两种溶洞处理措施,后经成桩质量检测,结果表明,针对本工程制定的施工技术和溶洞处理方案合理可行,I类桩占比达到97.8%,Ⅱ类桩占比2.2%,达到质量控制目标。 In order to study the pile forming process and quality control measures of bored piles under complex geological conditions,the article relies on engineering examples and takes the construction technology of bored piles in the presence of karst caves as the research object.Based on geological supplementary exploration data and technical scheme optimization,two targeted measures for karst cave treatment,namely"Clay rubble backfilling"and"Steel casing follow-up+Clay rubble backfilling",are proposed.After pile quality inspection,The results indicate that the construction technology and karst cave treatment plan developed for this project are reasonable and feasible,with Class I piles accounting for 97.8%and Class II piles accounting for 2.2%,achieving the quality control goal.
作者 郭龙龙 Guo Longlong(Shanxi Sanjian Group Co.Ltd.,Changzhi,Shanxi 046000)
出处 《江西建材》 2023年第6期264-266,269,共4页 Jiangxi Building Materials
关键词 钻孔灌注桩 岩溶地质 钢护筒跟进 黏土回填 Bored pile Karst geology Steel casing follow-up Clay backfill
  • 相关文献

参考文献5

二级参考文献14

共引文献32

同被引文献14

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部