摘要
文中以海安至启东高速公路洋口港互通主线桥施工为例,从预应力张拉、预应力施工修正、孔道压浆等方面对该项目现浇箱梁预应力施工技术进行了深入探析,确保工程管理目标的实现。
In this paper,taking the construction of the main line bridg eof Yangkou Port interworking between Hai'an and Qidong Expressway as an example,the prestressed construction technology of the cast-in-place box girder of the project is deeply analyzed fromf our aspects,such as prestressed tension,prestressed construction correction and hole grouting,so as to ensure the realization of projec tmanagement objectives.
作者
何佩伟
He Peiwei(The First Engineering Co.Ltd.,China Railway 20th Bureau Group,Suzhou,Jiangsu 215151)
出处
《江西建材》
2023年第3期310-311,314,共3页
Jiangxi Building Materials
关键词
洋口港互通主线桥
现浇箱梁
施工技术
Yangkou port interworking main line bridge
Cast-in-place box girder
Construction technology