文中以浙江舟山市临城开发区某办公大楼为例,对预应力管桩偏位、断裂补强、效果检测等施工问题进行了分析,并提出了具体控制措施。
Taking an office building in Lincheng Development Zone,Zhoushan City,Zhejiang province as an example,this paper analyzes hte construction problems of prestressed pipe pile deviation,fracture reinforcement,and effect detection of the project,and puts forward specific control measures.It has accumulated experience to solve the technical treatment problem of broken pile in static pressure pile.
作者
周雨
Zhou Yu(China Building Materials Industrial Geological Exploration Center,Shangrao,Jiangxi 334000)
出处
《江西建材》
2023年第3期215-216,222,共3页
Jiangxi Building Materials
关键词
预应力管桩
施工周期
软土地基
纠偏补强
Prestressed pipe pile
Construction period
Soft soil foundation
Deviation correction and reinforcement