摘要
文中基于GEO-SEEP/W程序对基层排水问题的分析,模拟了48h降雨下的渗流场变化,模拟结果表明,塑料盲沟材料可有效解决路基排水问题,具有重要意义。
In this paper,based on the analysis of subgrade drainage problems by the GEO-SEEP/W program,the changes in the seepage field under 48 hours of rainfall are simulated,and the simulation results show that plastic blind trench materials are important for the effective improvement of road subgrade drainage problems.
作者
卢青峰
Lu Qingfeng(Yueyang Transportation and Highway Engineering Construction Co.Ltd.,Yueyang,Hunan 414000)
出处
《江西建材》
2023年第2期324-325,328,共3页
Jiangxi Building Materials
关键词
山路
路基排水
渗流
塑料盲沟
Mountain road
Roadbed drainage
Seepage
Plastic blind ditch