摘要
文中结合彰武站市政道路改造工程1~8.0m箱涵下穿铁路大郑线,详细阐述了箱涵顶进的整个施工过程和控制要点,为后期类似工程提供指导借鉴。
This paper,in combination with the reconstruction project of Zhangwu Station,1-8.0m box culvert undercrossing the Dazheng Railway,elaborates the entire construction process and control points of box culvert jacking,which provides guidance and reference for some similar projects in the later period.
作者
宋中鑫
Song Zhongxin(Shandong Expressway Shuntong Road Bridge Engineering Co.Ltd.,Weifang,Shandong 262100)
出处
《江西建材》
2022年第12期288-290,共3页
Jiangxi Building Materials
关键词
顶进涵
控制
施工
Jacking culvert
Control
Construction