早强型喷射混凝土在郑万高铁巫山隧道中的施工试验 被引量:14

Construction T est of Rapid Hardening Shotcrete in Wushan Tunnel on Zhengzhou-Wanzhou High-speed Railway
下载PDF
导出
摘要 在郑万高铁巫山隧道建设中,为降低施工综合成本,提升喷射支护效果,加快工程进度,对采用早强型速凝剂与喷射混凝土纳米掺合料制备的早强型喷射混凝土开展工程试验研究。结果表明:1)同普通喷射混凝土相比,早强型喷射混凝土一次喷射厚度提高33 mm,回弹率降低14.5%;2)30 m隧道喷射施工可节省原材料费用2.77万元,节省工序时间24 h,经济效益显著。 In order to reduce the construction cost,improve the shotcreting quality and support effect,the rapid hardening shotcrete(RHS)is prepared for Wushan Tunnel on Zhengzhou-Wanzhou High-speed Railway.The project test is carried out on RHS prepared by early-strength setting accelerator and nano-mineral admixture.The testing results show that:(1)Compared with general shotcrete,the once-sprayed thickness of RHS is 33 mm higher,the rebound rate is 14.5%lower.(2)RMB 27700 yuan of raw material cost and 24 h of working procedure time can be saved for 30 m long tunnel shotcreting,and the economic benefit is notable.
作者 赵爽 洪锦祥 乔敏 王伟 曾鲁平 赵斌 ZHAO Shuang;HONG Jinxiang;QIAO Min;WANG Wei;ZENG Luping;ZHAO Bin(Jiangsu Sobute New Materials Co.,Ltd.,Nanjing 211100,Jiangsu,China;China Railway 18th Bureau Group Co.,Ltd.,Tianjin 300222,China)
出处 《隧道建设(中英文)》 北大核心 2020年第S01期369-373,共5页 Tunnel Construction
基金 中国铁路总公司科技研究开发计划课题(N2018G030)
关键词 高铁隧道 早强型喷射混凝土 喷射厚度 回弹率 工序时间 high-speed railway tunnel rapid hardening shotcrete sprayed thickness rebound rate working procedure time