上海轨道交通17号线西延伸工程先张法U型梁预应力张拉与锚下应力测试

Prestressed tension and anchor stress test on pretensioning U-shaped beams of Shanghai Metro Line 17 west extension project
下载PDF
导出
摘要 介绍了上海轨道交通17号线西延伸工程先张法预应力U型梁生产线布置、张拉工装与设备、张拉工序、同步张拉措施等,计算了3×30m跨U型梁张拉工艺下预应力损失和张拉伸长值,并选择U型梁典型部位预应力筋对其张拉过程中的锚下应力进行测试。 The production line layout,tensioning tools and equipment,tensioning process and synchronous tensioning measures on pretensioning U-shaped beams of Shanghai metro Line 17 west extension project were introduced.The prestressing loss and tensioning length of 3×30m span U-shaped beam under the tensioning process are calculated.Moreover,some typical prestressing strands of the U-shaped beam are selected to test the anchor stress during the tensioning process.
作者 周建诚 张德锋 陆峰 ZHOU Jiancheng;ZHANG Defeng;LU Feng(Shanghai Construction Building Materials Technology Group Co.,Ltd.,Shanghai 200086,China;Shanghai Construction Equipment Engineering Co.,Ltd.,Shanghai 200129,China)
出处 《建筑结构》 北大核心 2023年第S01期1765-1770,共6页 Building Structure
关键词 轨道交通 先张法 预制U型梁 预应力张拉 锚下应力测试 rail transport pretensioning method precast U-shaped beam prestress tensioning stress test under anchor
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部