期刊文献+

某带有大跨度连体的超限高层结构设计 被引量:1

Design of an out-of-code high-rise buiding with a large-span conjointed structure
下载PDF
导出
摘要 某工程为顶部带有大跨度连体的超限高层建筑,采用框架-剪力墙结构。介绍了结构体系和性能目标的选取,对结构进行了小、中、大震分析,对连体桁架采用反应谱法和时程分析法进行了对比分析,对大跨度连体部位进行了楼板应力分析及楼板舒适度分析。结果表明,本工程结构体系合理,措施适当,可以实现预定的性能目标,具有较好的抗震性能。 A project is a out-of-code high-rise buiding with a large-span conjointed structure on the top, frame-shear wall structure system was adopted. This paper introduces the selection of structural system and performance target, and conducts the analysis of small earthquake, medium earthquake and large earthquakes, response spectrum method analysis and time history analysis were conducted of conjoined truss, floor stress and structural comfort analysis were conducted of the large-span conjointed structure. The calculation results show that the structure system is reasonable, structural measures is appropriate and can meet the predetermined performance target, has better seismic performance.
作者 刘振文 胡雪瀛 刘涛 李汝伟 陈婷婷 唐小云 万卓明 LIU Zhenwen;HU Xueying;LIU Tao;LI Ruwei;CHEN Tingting;TANG Xiaoyun;WAN Zhuoming(Tianjin Architecture Design Institute Co.,Ltd.,Tianjin 300074,China)
出处 《建筑结构》 CSCD 北大核心 2022年第S02期46-50,共5页 Building Structure
关键词 大跨度连体 超限高层建筑 性能目标 弹塑性时程分析 舒适度分析 large-span conjointed structure complex over-limit high-rise buiding performance target analysis of elasto-plastic time history structural comfort analysis
  • 相关文献

参考文献2

二级参考文献1

共引文献46

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部