摘要 《高规》[1]中规定框架-核心筒结构的周边柱间必须设置框架梁,条文说明解释为由于框架-核心筒结构的柱距较大,为了保证其整体性,外周框架柱间必须要设置框架梁,形成周边框架。建筑师在设计时总有为了追求外观使得周框架柱间有时设置不了框架梁的情况,如果出现此种情况,此结构体系是否只能定义为框架-剪力墙结构,缺少了框架梁后结构整体性缺失多少,为此针对一个具体项目对其外周框架柱不能完全封闭进行研究其体系定义问题,并给出外周不封闭的解决措施。 It is stipulated in the high regulations that frame beams must be set between the surrounding columns of the frame core tube structure. The provisions are explained as that due to the large column distance of the frame-core tube structure, in order to ensure its integrity, frame beams must be set between the surrounding frame columns to form the surrounding frame. Architects in the design when there is always the pursuit of appearance makes weeks sometimes set the frame beams between the frame column, if appear this kind of situation, this structure system is only defined as frame-shear wall structure, lack of the frame beam after the loss of structural integrity, therefore we are for a specific project to study the peripheral frame column cannot completely closed its system definition, and give the solution of the outer circumference is not closed.
作者 刘长东 赵振旺 郭峰 秦凯 卢清刚 LIU Changdong;ZHAO Zhengwang;GUO Feng;QIN Kai;LU Qinggang(Beijing Institute of Architectural Design,Beijing 100045,China;Tianjin Zhuhe Yungou Architectural Design Co.,Ltd.,Tianjin 301700,China)
出处 《建筑结构》 CSCD 北大核心 2022年第S02期262-267,共6页 Building Structure
关键词 框架-核心筒 外周框架不封闭 整体性 frame-core tube peripheral frame not closed integrity
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部