期刊文献+

混合结构斜拉索分级张拉施工过程模拟 被引量:1

Simulation of the construction process of the hybrid structure cable tension by stages
下载PDF
导出
摘要 对上海某创新园区混合结构工程进行施工过程模拟分析,该结构采用钢筋混凝土核心筒-钢桁架-钢框架-预应力拉索结构形式。由于结构形式复杂,筒体之间采用桁架加强的斜拉结构,拉索为结构的主要受力构件,在施工过程中需准确控制张拉索力以达到设计要求,因此采用SAP2000根据预应力拉索设计值进行预应力拆解计算,利用Midas Gen有限元分析软件,进行预应力拉索张拉施工过程模拟,探究结构整体变形及各索力变化规律。结果表明:采用四级循环张拉能够有效控制各拉索内力,对于结构整体竖向变形起到良好的控制作用,为预应力混合结构拉索施工过程提供了参考。 The construction process of a hybrid structure in Shanghai Innovation Park is simulated and analyzed.The structure is composed of reinforced concrete core tube,steel truss,steel frame and prestressed cables.Due to the complexity of the structure,the truss-reinforced cable-stayed structure is adopted between the tube bodies,and cable is the main bearing member of the structure,so it is necessary to accurately control the tension force during the construction to meet the design requirements,therefore,SAP 2000 is used to calculate the pre-stressed cable disassembly according to the design value of the pre-stressed cable,and Midas Gen finite element analysis software is used to simulate the construction process of the pre-stressed cable tension,the whole deformation of the structure and the variation law of cable forces are investigated.The results show that the internal forces of cables can be effectively controlled by four-stage cyclic tension,and the vertical deformation of the whole structure can be well controlled.
作者 蒯蓓蕾 赵文达 曾旭 李展羽 KUAI Beilei;ZHAO Wenda;ZENG Xu;LI Zhanyu(China Construction Eighth Engineering Division Co.,Ltd.,Shanghai 200122,China)
出处 《建筑结构》 CSCD 北大核心 2022年第S01期2984-2988,共5页 Building Structure
关键词 斜拉结构 预应力拉索 施工过程模拟 分级张拉 有限元分析 cable-stayed structure prestressed stay cable construction process simulation grading tension finite element analysis
  • 相关文献

参考文献7

二级参考文献34

共引文献104

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部