静压开口预应力高强混凝土管桩设计及常见问题分析 被引量:5

Design and common problems analysis of jacked open-ended prestressed high-strength concrete pipe pile
下载PDF
导出
摘要 预应力高强混凝土管桩(PHC管桩)因其自身的优点越来越多地应用到实际工程中,PHC管桩通常采用静力压桩法进行施工。对于结构设计人员来说,仅掌握其结构设计是不够的,现实中常会遇到施工问题,如何及时解决这些问题对设计人员提出了更高的要求。对PHC管桩从结构设计、沉桩机理、施工单位反映的问题、认识上的误区、事故处理等方面进行分析,以期对结构设计及相关人员有所帮助。 Because of its own advantages,the prestressed high-strength concrete pipe pile(PHC pipe pile for short)is more and more used in practical engineering,PHC pipe pile is usually constructed by Jacked driving method.For structural designers,it’s not just enough to master the structural design,Construction problems are often encountered in reality,How to solve these problems in time puts forward higher requirements for designers.The PHC pipe pile is analyzed from the aspects of structural design,jacking mechanism,problems reflected by the construction unit,misunderstanding and accident treatment,which is in order to provide help for structural designers and related personnel.
作者 王伟良 刘萦棣 WANG Weiliang;LIU Yingdi(Shanghai Zhongjian Architectural Design Institute Co.,Ltd.,Shanghai 200122,China)
出处 《建筑结构》 CSCD 北大核心 2021年第S01期2122-2127,共6页 Building Structure
关键词 PHC管桩 沉桩机理 结构设计 认识误区 事故处理 PHC pipe pile jacking mechanism structural design misunderstanding accident treatment
  • 相关文献

参考文献1

二级参考文献20

  • 1蒋跃楠,韩选江.静压桩终压力及单桩竖向承载力的相关性[J].南京工业大学学报(自然科学版),2006,28(5):63-66. 被引量:12
  • 2ZHANG L M, NG C W W, CHAN F, PANG W. Termination criteria for jacked pile construction and load transfer in weathered soils[J]. Jourrlal of Geotechnical and Geoenvironmental Engineering, 2006, 132(7): 819 - 829.
  • 3YU F, YANG Y E Discussion of "termination criteria forJacked pile construction and load transferin weathered soils" by L M Zhang, C W W Ng, F Chan and H W Pang[J]. Journal of Geotechnical and Geoenvironmental Engineering, 2007, 133(11): 1477- 1479.
  • 4GAVIN K G, O'KELLY B C. Effect of friction fatigue on pile capacity in dense sand[J]. Journal of Geotechnical and Geoenvironmental Engineering, 2007, 133(1): 63 - 71.
  • 5AIREY D W, Al-DOURI R, POULOS H G,Estimation of pile friction degradation from box test[J]. Geotechnical Testing Journal, 1992, 15(4): 388 - 392.
  • 6RANDOLPH M F, DOLWIN J, BECK R. Design of driven piles in sand[J]. Geotechnique, 1994, 44(3): 427 - 448.
  • 7RANDOLPH M F. Science and empiricism in pile foundation design[J]. Geotechnique, 2003, 53(10): 847 - 875.
  • 8WHITE D J. An investigation into the behavior of Press-in piles[D]. UK: University of Cambridge, 2002.
  • 9WHITE D J, LEHANE B N. Friction fatigue on displacement piles in sand[J]. Geotechnique, 2004, 54(10): 645 - 658.
  • 10LEHANE B M, WHITE D J. Lateral stress changes and shaft friction for model displacement piles in sand[J]. Canadian Geotechnical Journal, 2005, 42(4): 1039 - 1052.

共引文献26

同被引文献53

引证文献5

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部