摘要 为解决某核电厂循环水系统排水段的部分内衬玻璃钢混凝土管道出现的大面积鼓泡、开裂、表面存在疏松缺陷等问题,分析了玻璃钢鼓泡、开裂原因,并对混凝土管道做了腐蚀评估。结果表明,在压力作用下,地下水渗透入不密实的混凝土管道将导致内衬玻璃钢发生鼓泡、开裂;混凝土管道的强度满足要求,且碳化深度对混凝土结构的危害较小;经半电池电位检测及实际凿开验证,混凝土中的钢筋已经发生锈蚀。 In order to solve the problems of large area bubbling,cracking and loose surface defects in the partially lined FRP concrete pipe of the circulating water system of a nuclear power plant,this paper analyzes the reasons for the bubbling and cracking of the FRP pipe,and makes corrosion evaluation for the concrete pipe.The results show that through the unconsolidated concrete pipes,groundwater causes bubbling and cracking of the lining FRP under pressure,the strength of concrete pipes meets the requirements,and the depth of carbonization is less harmful to concrete structures,and the half-cell potential detection and actual chiseling verify that the steel in the concrete has been rusted.
作者 胡明磊 张维 张宪超 文杰 Hu Minglei;Zhang Wei;Zhang Xianchao;Wen Jie(China Nuclear Power Operations Management Co.Ltd.,Haiyan,Zhejiang,314300,China)
出处 《核动力工程》 EI CAS CSCD 北大核心 2019年第S02期163-166,共4页 Nuclear Power Engineering
关键词 核电厂 内衬玻璃钢管 钢筋混凝土 腐蚀评估 Nuclear power plant Lined FRP pipeline Steel reinforced concrete Corrosion assessment
  • 相关文献

参考文献5

二级参考文献27

共引文献86

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部