期刊文献+

基于层次分析法和模糊综合评判的阵地工程抗击力效能评估模型 被引量:3

Evaluation model of resistance effectiveness of position engineering based on AHP and fuzzy comprehensive evaluation
原文传递
导出
摘要 针对阵地工程面临的威胁和挑战,分析了阵地工程抗击力的内涵以及信息化条件下影响阵地工程抗击力的主要因素,构建了阵地工程抗击力效能指标体系;针对军事问题的模糊性和评估指标的复杂性,建立了以模糊综合评判和层次分析法为理论支撑的阵地工程抗击力效能评估模型。通过案例的分析与解算,验证了该模型应用于阵地工程抗击力效能评估的可行性和有效性。 In view of the threats and challenges faced by the position engineering,this paper analyzes the connotation of the position engineering resistance and the main factors influencing the position engineering resistance under the condition of informatization,and constructs the index system of the resistance effectiveness of position engineering.Aiming at the fuzziness of military problems and the complexity of evaluation indexes,an evaluation model of resistance effectiveness of position engineering is established based on fuzzy comprehensive evaluation and AHP(analytic hierarchy process).The feasibility and effectiveness of the model applied to the evaluation of resistance effectiveness of position engineering are verified by case analysis and calculation.
作者 朱万红 朱旭 李锐 孙鹏飞 ZHU Wanhong;ZHU Xu;LI Rui;SUN Pengfei(Army Engineering University of PLA,Nanjing 210007,China)
机构地区 陆军工程大学
出处 《防护工程》 2019年第4期34-37,共4页 Protective Engineering
关键词 阵地工程 抗击力 效能评估 层次分析法 模糊综合评判 position engineering resistance effectiveness evaluation AHP fuzzy comprehensive evaluation
  • 相关文献

参考文献3

二级参考文献1

  • 1张最良等.军事运筹学[M]军事科学出版社,1993.

共引文献5

同被引文献42

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部