期刊文献+

电力工程变电站一次设备安装调试施工技术探究

Research on Installation and Commissioning of Primary Equipment in Substation of Power Engineering
下载PDF
导出
摘要 随着电力工程的不断发展,变电站作为电力系统的重要组成部分,一次设备的安装调试施工技术显得尤为关键。目前,电力系统越来越复杂,一次设备的高效安装和可靠调试成为确保电力系统正常运行的基础,然而,由于一次设备涉及众多专业领域,其安装调试过程存在许多技术难题和工程挑战。因此,对电力工程变电站一次设备安装调试施工技术进行深入研究,对提高电力系统运行稳定性和可靠性具有重要意义。鉴于此,本文针对电力工程变电站一次设备安装调试施工技术的应用展开详细分析,为进一步提高电力工程运行质量奠定坚实基础。 With the continuous development of electrical engineering,substations,as an important component of the power system,the installation and commissioning construction techniques for primary equipment are particularly critical.Currently,power systems are becoming increasingly complex,and efficient installation and reliable commissioning of primary equipment have become the foundation for ensuring the normal operation of the power system.However,due to the numerous professional fields involved in primary equipment,there are many technical difficulties and engineering challenges in the installation and commissioning process.Therefore,conducting indepth research on the installation and commissioning construction techniques for primary equipment in power engineering substations is of significant importance for improving the stability and reliability of power system operation.In view of this,this article provides a detailed analysis of the application of installation and commissioning construction techniques for primary equipment in power engineering substations,laying a solid foundation for further improving the operational quality of power engineering.
作者 张圣强 李传莹 李宝玉 孙鸿旭 Zhang Shengqiang;Li Chuanying;Li Baoyu;Sun Hongxu(Jinan Luyuan Electric Group Co.,Ltd.,Jinan,Shandong,China,250001)
出处 《仪器仪表用户》 2024年第3期1-3,6,共4页 Instrumentation
关键词 电力工程 变电站 一次设备 安装调试 施工技术 power engineering substation primary equipment installation and commissioning construction techniques
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部