摘要
针对热电联产机组的热电耦合无法满足电网调峰要求的情况,改造中常采用利用原有高、低压旁路系统进行供热的技术方案。对某机组高、低压旁路供热改造在调试过程中遇到的一些问题进行了分析,并对其处理的方法进行了阐述,为同行业内的相关调试提供一定借鉴与参考。
In view of the fact that the thermal-electric coupling of cogeneration units cannot meet the peak load regulation requirements of power grid,the technical scheme of using the original high and low pressure bypass system for heating is often adopted in the retrofit Some problems encountered in the commissioning process of the high and low pressure bypass heating transformation of a unit are analyzed,and the treatment methods are described,which provides reference for the relevant commissioning in the same industry.
作者
张海丰
桂朝伟
贾铁鑫
ZHANG Hai-feng;GUI Chao-wei;JIA Tie-xin(Liaoning Dongke Electric Power Co.,Ltd.,Shenyang 110179,Liaoning,China;Liaoning Shenyang Hongyang Thermal Power Co.,Ltd.,Liaoyang 111018,Liaoning,China)
出处
《电站辅机》
2019年第3期30-32,39,共4页
Power Station Auxiliary Equipment
关键词
热电解耦
电网
调峰
旁路供热
调试
汽轮机
thermal-electric coupling
power grid
peak load regulation
bypass heating
commissioning
turbine