基带处理单元(Building Base band Unit,BBU)是5G网络的重要组成部分,其集中安装的部署方式对机房空间、电源、制冷带来极大的压力。研究优化集中部署的场景,优化BBU机柜的布局,实现机柜、电源配套配置、施工工艺的标准化,提高施工效率,有助于5G BBU的快速部署,同时提升机房利用率,降低电费等运营成本。
As an important part of 5G network,the centralized installation and deployment of Building Base band Unit(BBU)brings great pressure to the space,power supply and refrigeration of communication machine room.Study and optimize the scenario of centralized deployment,optimize the layout of BBU cabinet,realize the standardization of cabinet,power supply supporting configuration and construction process,improve construction efficiency,contribute to the rapid deployment of 5G BBU,improve the utilization rate of machine room and reduce the operation cost such as electricity charge.
作者
蔡璟珑
CAI Jinglong(Xiamen Branch,China Telecom Corporation Limited,Xiamen 361003,China)
出处
《电声技术》
2021年第12期106-108,112,共4页
Audio Engineering
关键词
BBU
集中部署
节能
BBU
centralized deployment
energy saving