摘要
本文主要探讨了在露采矿山地质环境整治中土石方量计算的重要性,包括编制工程预算、安排施工计划和现场组织调度等方面。比较研究了断面法、方格网法、DTM法三种土石方量计算方法的基本原理、建立过程、异同点及适用条件,从而为露采矿山地质环境整治中土石方量计算提供参考。
This paper mainly discusses the importance of earthwork calculation in the geological environment improvement of open-pit mines,including the preparation of engineering budget,construction plan and on-site organization and dispatching,etc.This paper compares and studies the basic principle,establishment process,similarities and differences and applicable conditions of the three earthwork calculation methods:section method,square grid method and DTM method,so as to provide reference for earthwork calculation in the geological environment regulation of open-pit mines.
作者
曹春野
CAO Chun-ye(The second Geological Brigade of Jiangsu Provincial Bureau of Geology and mineral resources,Changzhou 213022,China)
出处
《世界有色金属》
2023年第3期193-195,共3页
World Nonferrous Metals
关键词
露采矿山地质环境整治
土石方量计算
断面法
方格网法
DTM法
geological environment improvement of open pit mines
calculation of earthwork volume
section method
square grid method
DTM method