期刊文献+

大尹格庄金矿深部采场顶板安全控制技术浅析

Analysis on roof safety control technology of deep stope in Dayingezhuang Gold Mine
下载PDF
导出
摘要 大尹格庄金矿采场的安全高效开采一直受到采场顶板和矿柱的安全可靠性制约。为此,该矿采取了多项技术措施,以确保采场顶板的安全稳固。首先,通过对采场安全跨度稳定性进行分析,并计算最小矿柱尺寸和受力情况,确定了矿柱的合理尺寸和位置,有效地提高了矿柱的承载能力。其次,进行了采场顶板锚索支护分析,并针对不同地质条件和采场布置情况,制定了相应的加固方案,使得采场顶板的承载能力显著提高。最后,根据光面爆破的特点,确定了最佳的爆破参数,减小了岩石震动和爆炸冲击力,保证了采场顶板的稳定性和安全性。通过这些技术措施的实施,大尹格庄金矿采场的安全稳固得到了有效保障,为后续的生产操作奠定了坚实的基础。 The safety and efficient mining of Dayingezhuang gold mine has always been constrained by the safety and reliability of its roof and pillars.To address this issue,the mine has implemented multiple technical measures to ensure the safety and stability of the roof.Firstly,by analyzing the stability of the mining area and calculating the minimum pillar size and force situation,the reasonable size and location of the pillars were determined,effectively improving their load-bearing capacity.Secondly,an analysis of roof anchor support was conducted,and corresponding reinforcement programs were developed based on different geological conditions and mining layouts,significantly enhancing the load-bearing capacity of the roof.Finally,optimal blasting parameters were identified based on smooth blasting characteristics,reducing rock vibrations and explosive impacts to ensure the stability and safety of the mining area roof.With the implementation of these technical measures,the safety and stability of the Dayingezhuang gold mine's mining area have been effectively ensured,laying a solid foundation for subsequent production operations.
作者 姜磊 JIANG Lei(ZhaoJin Mining Industry Co.,Ltd.Dayin Gezhuang Gold Mine,Zhaoyuan 265400,China)
出处 《世界有色金属》 2023年第2期226-228,共3页 World Nonferrous Metals
关键词 采场顶板 主应力 安全跨度 正交试验 stope roof principal stress safety span orthogonal test
  • 相关文献

参考文献4

二级参考文献16

共引文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部