针对中电国际安徽淮南平圩发电公司二期机组启动时高压加热器正常疏水管道振动原因进行分析,并采取有效措施,成功避免了振动的发生,保证了设备安全,取得了良好效果。
Based on the analysis of the causes of the normal drainage pipes vibration during the start-up of the high-pressure heater of the second phase units of Huainan Pingwei Power Generation Company of China Power International, effective measures are taken to successfully avoid the vibration, ensure the safety of the equipment and achieve good results.
出处
《安徽电力》
2019年第3期52-54,共3页
Anhui Electric Power
关键词
汽轮机
高压加热器
正常疏水管道
振动
措施
steam turbine
high-pressure heater
normal drainage pipe
vibration
measure