本文通过对六盘水站施工图站改方案和拟建高架站房方案的分析,并结合站场布置型式,对正在运营的六盘水站新建高架站房引起的站场过渡方案进行研究。通过对过渡方案的不断优化,同时结合专业和运输部门的意见,形成了最终六盘水站过渡方案,从而总结出既有站过渡需要注意的问题,可为类似工程提供借鉴。
Based on the analysis of the construction drawing of liupanshui station and the plan of the proposed elevated station,combining with the station layout,this paper studies the transition plan of the station caused by the new elevated station in liupanshui station..The final transition plan of Liupanshui station was formed,through the optimization of the transition plan and combining the opinions of the professional and transportation departments,and the key points for the transition plan of existing station yard were summarized,which can provide reference for similar projects.