富水砂卵石土层中钢板桩围堰施工技术 被引量:2

Construction Technology for Steel Sheet Pile Cofferdam in Water-rich Sandy Cobble Soil Layer
下载PDF
导出
摘要 在砂卵石土层中,直接插打拉钢板施工,无法插打到位。针对该施工难题,本文结合成昆铁路峨眉至米易段扩能工程站前工程黄水安宁河31号墩施工,详细阐述了桩基采用筑岛法填土,在插打钢板桩位置使用冲击钻引孔,换填机制砂后插打拉森钢板桩进行围堰施工的总体方案及主要施工工艺。该施工方案成功解决了富水砂石土层中围堰的施工技术难题,施工安全可靠,止水效果良好,可供类似桥梁施工参考借鉴。 In sandy cobble soil layer,the steel plate can’t be directly inserted in place in the construction.For this construction difficulty,combined with the construction of 31#pier of Huangshui Anning River in capacity expansion engineering of E’mei-Miyi section of Chengdu-Kunming Railway,overall plan and main construction technologies are elaborated in the paper,such as island filling method for construction of pile foundation,guide with percussion drill in the position inserting sheet pile and cofferdam construction by inserting Larsen steel sheet pile after filling the machine-made sand.This scheme has successfully resolved the construction difficulties of cofferdam in water-rich sandy cobble soil layer.It is safe and reliable,and good in water-stop effect,which can provide references for similar bridges construction.
作者 朱强洪 ZHU Qianghong(China Railway Erju Corporation Ching Engineering Co.,Ltd.,Chengdu 610031,China)
出处 《高速铁路技术》 2018年第S01期131-135,共5页 High Speed Railway Technology
关键词 钢板桩 围堰 富水砂卵石 施工 steel sheet pile cofferdam water-rich sandy cobble construction
  • 相关文献

参考文献4

二级参考文献10

共引文献32

同被引文献4

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部