摘要
朱码节制闸是一座集排涝、灌溉、发电等功能的水利水电工程。因受周边复线船闸、桥梁等既有建筑物布置及地形现状影响,选择确定朱码节制闸拆除重建的新闸址问题较为复杂,需要进行深入研究。从水闸进出水条件、对航道影响、施工组织设计、征占地、概算投资等因素综合考虑,并通过数学模拟计算加以验证,综合分析论证比选了可行的朱码节制闸拆除重建新闸址方案。研究成果可为今后类似水闸等工程选址提供较高的参考价值。
Zhuma check gate is a water conservancy and hydropower engineering of drainage,irrigation,power generation and other functions.Affected by the influence of the surrounding buildings such as double line ship lock,bridge and topography,it is more complicated to choose the new location of Zhuma check gate demolish project,further research and analysis are needed.Consideration of water inflow and outflow conditions,waterway,construction,land acquisition,investment and other factors,verify the results of mathematical simulation,comparison and selection of schemes for location of Zhuma check gate demolish project.The research results can be used as reference for similar projects.
作者
戴秋萍
陈健
韦姝
DAI Qiuping;CHEN Jian;WEI Shu(Jiangsu Province Water Conservancy Construction Bureau,Nanjing 210029,China)
出处
《灌溉排水学报》
CSCD
北大核心
2020年第S02期90-94,共5页
Journal of Irrigation and Drainage
关键词
水闸
工程
拆除重建
闸址比选
sluice
project
demolish
location comparison and selection for sluice gates