抽水蓄能电站工程典型招标澄清问题分析与研究

Analysis and Research on Clarification of Bidding for Pumped Storage Power Station
下载PDF
导出
摘要 本文对抽水蓄能电站招标过程中的澄清问题进行梳理分析和总结,提出了抽水蓄能电站招标文件编制存在的工程量清单计量单位错误、工程量清单项目特征描述不完整;道路维护、环境保护等总价项目工作内容描述不全面等典型澄清问题并对典型澄清问题提出了相应避免措施和建议,以期为高质量开展招标文件编制、减少澄清答疑工作任务、提高合同履约质量、促进工程建设有序进行夯实基础。 This paper combs,analyzes and summarizes the clarification and question answering problems in the bidding process of the main bid of the pumped storage power station,and puts forward the common clarification problems in the preparation of the bill of quantities,such as the technical specifications,drawings,incomplete description of the bill of quantities,and the format of the bill of quantities,in order to provide reference for the preparation of the bidding documents of the main bid of the pumped storage power station,ensure the smooth implementation of the bidding work,and promote the orderly construction of the pumped storage project.
出处 《工程经济》 2023年第5期76-80,共5页 ENGINEERING ECONOMY
基金 国网新源集团科技项目(SGXYKJ-113)
关键词 抽水蓄能电站 招标文件 工程量清单 澄清问题 Pumped Storage Power Station Tender Documents Bill of Quantity Clarify and Answer Questions
  • 相关文献

参考文献6

二级参考文献6

共引文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部