跨河丁坝整治游荡性河道的工程研究 被引量:2

Engineering study on treating braid river by using cross-river groin
下载PDF
导出
摘要 游荡性河道的整治是黄河治理工程的难点之一。黄河宁夏段二期防洪工程在Ω形河段实施截弯取直工程,首次采用丁坝跨越黄河全断面进行截流,为游荡性河道的整治提供了新的经验。本文对丁坝附近水沙特性进行了机理分析,指出防止截流过程加剧河床冲刷是该类型工程需要重点考虑的问题。依据断面水文监测与河床形态观测,及时在受冲刷河床空抛铅丝石笼进行保护,能够起到有效护底、保障截流安全的作用。提出了水文监测及施工区域的水下地形变化测量,及时预测、预判及报告河道来水、凌情情势变化情况;提出了开挖引河进行分流和双向进占截流;成功地实现了黄河合拢截流。为周边三十多万亩农田、二十多万群众的生命财产安全筑起了一道安全屏障。同时给黄河河道整治提供了理论依据,为河道治理措施的采用以及方案设计提供帮助、积累经验。 The improvement of the braid river is one of the difficulties in the Yellow River control project.The phaseⅡin Ningxia section of the Yellow River flood control project is implemented inΩshape of sectional bending straightening project.It is the first time to use the groin to intercept the river across the whole section of the Yellow River,which provides the new experience for the improvement of braid river.The water and sediment characteristics near the dam are analyzed,and it is pointed out that preventing the aggravating of the river bed scour in the closure process is the key issue to be considered in this type of project.According to the section hydrological monitoring and bed morphology observation,the timely protection in the scour bed by casting the lead wire stone cages should be carried out,which could play the effective role in the bed protection to ensure the safety of the closure.The hydrological monitoring and underwater topographic change measurement in the construction area are put forward,and the timely prediction,judgment and report for the change of the inflow and the ice status are suggested.The diversion and bidirectional inflow closure of the excavated diversion river are proposed.The closure of the Yellow River is successfully achieved.A safety barrier has been built for the safety of more than 300000 mu farmland and more than 200000 people’s lives and property.It also provides the theoretical basis for river regulation of the Yellow River,and provides the help for river regulation measures and design schemes.
作者 石建勋 张廷华 马伟平 Shi Jianxun;Zhang Tinghua;Ma Weiping(School of Civil Engineering,Northwest Minzu University,Lanzhou 730030,China;Ningxia Water Resources and Hydropower Engineering Bureau Co.,Ltd.,Yinchuan 750000,China)
出处 《工程勘察》 2020年第2期40-44,共5页 Geotechnical Investigation & Surveying
基金 国家自然基金地区基金(61861038) 西北民族大学中央高校基本科研业务费资金资助项目(31920190168) 宁夏水利水电工程局有限公司资助(NGJKY002).
关键词 丁坝 游荡性河道 截流 流场 监测 groin braid river stream closure flow field monitoring
  • 相关文献

参考文献4

二级参考文献41

  • 1李文家.小浪底水库防洪作用分析[J].人民黄河,1993,15(3):17-22. 被引量:3
  • 2明道华.泥沙级配对丁坝附近冲刷的影响[J].人民长江,1994,25(1):59-62. 被引量:5
  • 3李永乐,刘汉东,刘海宁,刘慧卿,刘翠然.黄河大堤非饱和土土-水特性试验研究[J].岩土力学,2005,26(3):347-350. 被引量:39
  • 4梁展平.美国密西西比河密苏里河治理情况综述[R].郑州:黄河水利科学研究院,1983..
  • 5谭颖 沈惠漱 梁忠贤 等.美国密西西比河中下游河运与航运工程[R].,1996.11.
  • 6A.依尔穆罕默多夫 等 龙沛霖 赵业安.游荡性河道强烈变形及其整治方法[A].龙沛霖,赵业安.译自1986年第五届全国水文会议论文集[C].,1986..
  • 7.历代治黄文选(下)[M].郑州:河南人民出版社,1989..
  • 8勾兆莉,武彩萍,宋莉萱,等.丁坝坝头冲刷机理探讨[C] ∥第十四届中国海洋(岸)工程学术讨论会论文集.北京:海洋出版社,2009:1133-1135.
  • 9哈岸英.冲积河流丁坝附近水沙运动及河床变形研究[D].西安:西安理工大学,2010.
  • 10E B 波尔达科夫,O B 安得列也夫.跨河桥渡[M].吕永欣,全雪华,译.北京:人民交通出版社,1959.

共引文献40

同被引文献12

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部