泥水盾构排浆接力泵接入位置的计算与应用 被引量:2

Calculation and Application on Connection Position of Slurry Discharge Relay Pump in Slurry Shield Tunnel
下载PDF
导出
摘要 针对泥水盾构环流系统中极为常见的排浆泵添加接力泵的实际需求,在接入时机合理选择的问题上,摒弃了以往仅凭传统经验的做法,充分结合相关流体力学知识与专业生产厂家经验,从不同的接入位置入手,在预留适度冗余系数的基础上,创新性地尝试将初始排浆泵分别达到其功率及扬程的理论极限,综合考虑最小值,并在随后的实际安装应用中得到了较好的验证,在同类的泥水盾构工程特别是长大泥水隧道施工中,具有一定的借鉴意义与推广价值. Aimed at the practical demand of adding relay pumps to slury discharge pumps in mud shield circulation system,the traditional practice was abandoned on reasonable choice of access time,an innovative attempt was made to put the initial slurry discharge pumps into operation on the basis of reserving appropriate redundancy coefficient and fully combining relevant hydrodynamic knowledge and professional manufacturer's experience.The theoretical limits of power and height had been reached respectively.By comprehensive considerations minimal value,the subsequent practical installation and application had been well verified.It had certain reference significance and popularization value in similar slurry shield engineering,especially in the construction of long slurry tunnel..
作者 赵国栋 Zhao Guodong(China Railway 14th Bureau Group Mega Shield Technology Center,Nanjing Jiangsu 211899,China)
出处 《铁道建筑技术》 2019年第S01期149-153,共5页 Railway Construction Technology
基金 中国铁建股份有限公司科技研发计划项目(15-C11).
关键词 泥水盾构 排浆泵 位置选择 slurry shield slurry pump location selection
  • 相关文献

参考文献5

二级参考文献39

共引文献27

同被引文献24

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部