某矿坑内卷扬机硐室加固方案

Reinforcement scheme of winch chamber in a mine
下载PDF
导出
摘要 本文分析某矿坑内卷扬机硐室出现破损沉降的原因,然后针对硐室所处的特殊地层而无法使用常规加固措施的情况下,提出了对穿式锚索+钢筋砼墙+壁后注浆这种联合加固方案,并给出硐室加固过程中应注意的事项。对类似坑内硐室工程的围岩控制和加固维修有一定借鉴意义。 This paper analyzes the causes of the damaged settlement of the winch chamber in a mine pit in Yunnan Province,and then puts forward the joint reinforcement scheme of through anchor cable+reinforced concrete wall+grouting behind the support in the case of the special stratum where the chamber is unable to use the conventional reinforcement measures,and gives the precautions in the reinforcement process of the chamber.It can be used for reference in the surrounding rock control and reinforcement maintenance of similar tunnel engineering.
作者 过曾明 安建英 GUO Zeng-ming;AN Jian-ying(China ENFI Engineering Corporation,Mine Engineering Department,Beijing 100038,China)
出处 《世界有色金属》 2020年第10期30-32,共3页 World Nonferrous Metals
关键词 坑内卷扬机硐室 破损 沉降 特殊地层 加固 对穿式锚索 壁后注浆 Winch chamber in pit damaged settlement special stratum reinforce fixed anchor cable at both ends grouting behind the support
  • 相关文献

参考文献11

二级参考文献47

共引文献53

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部