国际EPC水电工程成套设备采购供货管理

Procurement and Supply Management of Complete Sets of Equipment for International EPC Hydropower Project
下载PDF
导出
摘要 在总承包项目中,机电成套设备的设计、采购供货和安装施工作为工程的一部分占据了重要的位置,决定着整个工程项目最终的效果和效益.人们普遍从成本、质量、进度等方面进行管理,但影响质量和进度的往往是一些细节和不被重视的方面.在国际工程中处理任何一个细节问题都是大问题,因此,需要多方位多角度的去抓管理的不足之处,积小胜为大胜,最终取得整个项目的成功.文章从设计、制造等几个不易被人重视的方面,介绍了成套设备采购中应该关注的几个重点,对设备采购工作起到借鉴和指导作用. In the general contracting project,the design,procurement,supply and installation construction of mechanical and electrical equipment occupy an important position as a part of the project,which determines the final effect and benefit of the whole project.People generally manage from the aspects of cost,quality and progress,but the factors that affect the quality and progress are often some details and neglected aspects.It is a big problem to deal with any detail problem in international engineering.Therefore,it is necessary to grasp the deficiencies of management from various aspects and angles,accumulate small victories into great victories,and finally achieve the success of the whole project.This paper introduces several key points in the procurement of complete sets of equipment from the aspects of design and manufacturing which are often not to be taken seriously,which can provide reference and guidance for equipment procurement.
作者 杨茁 YANG Zhuo(Sinohydro Bureau 5 Co.,LTD,Chengdu,Sichuan,610066)
出处 《四川水力发电》 2020年第S01期128-130,133,共4页 Sichuan Hydropower
关键词 EPC工程 成套设备 采购模式 注意事项 EPC project complete sets of equipment procurement attentions
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部